Morocco ReportMorocco ReportMorocco Report
  • Automotive
  • Business
  • Entertainment
  • Health
  • Lifestyle
  • Luxury
  • News
  • More
    • Sports
    • Technology
    • Travel
Reading: 28GW TOPCon manufacturing capacity added in Astronergy
Share
Font ResizerAa
Font ResizerAa
Morocco ReportMorocco Report
Search
  • Automotive
  • Business
  • Entertainment
  • Health
  • Lifestyle
  • Luxury
  • News
  • More
    • Sports
    • Technology
    • Travel
© 2022 Morocco Report | All Rights Reserved
Home » 28GW TOPCon manufacturing capacity added in Astronergy
PR Newswire

28GW TOPCon manufacturing capacity added in Astronergy

Published: April 28, 2023
Share
SHARE

HANGZHOU, China, April 28, 2023 /PRNewswire/ — Manufacturing bases of Astronergy saw 28GW n-type TOPCon manufacturing capacity grow on April 27, marking once more enhancement in the company’s n-type TOPCon production strength after loading 5GW TOPCon module manufacturing capacity in early April this year.

The phase four project of Astronergy Manufacturing Base saw the move-in of 8GW n-type TOPCon cell equipment and 12GW TOPCon module equipment to one of its new cell workshops and two of its new module workshops on April 27. And at the same day, 8GW TOPCon cell equipment arrived at Astronergy Fengyang Manufacturing Base workshop and was ready to start the trial run.

A photo captures a new TOPCon module equipment moved in a module workshop in Astronergy Haining Manufacturing Base.

Loading new TOPCon manufacturing capacities in two manufacturing bases simultaneously, the absolute confidence and strength of Astronergy in its TOPCon tech and TOPCon modules are evident.

The capacity leapfrog of TOPCon at Haining Manufacturing Base – Astronergy global headquarters and R&D center makes the base hitting production capacities of over 17GW PV cells and over 24GW PV modules.

Said Haiyan Huang, EVP & CSO at Astronergy, the 8GW TOPCon cell equipment and 12GW TOPCon module equipment are expected to gradually run at full load 60 days later and Haining Base is to fulfil its target of doubling production capacity and production value before 2025.

As a newly exposed and the sixth manufacturing base of Astronergy, Fengyang Manufacturing Base is in China’s Anhui province, focusing on TOPCon cell production. Soon after the equipment is in place, the manufacturing base will see the rollout of the first piece TOPCon cell in late May and is expected to run at full capacity in June.

As the pioneer in n-type TOPCon PV modules, Astronergy is aiming to make the TOPCon modules one of its main products. Adding new TOPCon capacities in cells and modules is certainly a firm step forward to being the competitive supplier of PV modules worldwide.

Photo – https://mma.prnewswire.com/media/2065455/A_n_type_TOPCon_PV_module_manufacturing_equipment_moved_a_workshop.jpg

Cision View original content:https://www.prnewswire.co.uk/news-releases/28gw-topcon-manufacturing-capacity-added-in-astronergy-301810467.html

You Might Also Like

DXC Names Anders Lange as Chief Procurement Officer
Amid Global Rise in Internet Shutdowns, Internet Society Launches ‘NetLoss’ Calculator to Measure Economic Impact
Vantage unveils significant impact of donation on UNHCR’s ongoing refugee support in Australia
INDRA SIGNS AGREEMENT WITH AXISCADES TO BOOST PRODUCTION OF CUTTING-EDGE SYSTEMS IN INDIA
FXGT.com Takes the Lead as the Official Global Partner at iFX Expo Asia 2024
Share This Article
Facebook TwitterEmail Print
Previous Article Hisense Devotes to Bring Consumers with Immersive Experience through Innovative TV Products
Next Article HUAWEI Themes and Mahmood Al Abadi Unravel the Majestic World of the Arabic Heritage

Latest News

UAE president and EU Council chief discuss regional security
UAE president and EU Council chief discuss regional security
Bahrain and UK review regional tensions and economic risks
Bahrain and UK review regional tensions and economic risks
UAE president hosts UK PM for regional security talks
UAE president hosts UK PM for regional security talks
Abdullah bin Zayed, Kaja Kallas review UAE-EU ties
Abdullah bin Zayed, Kaja Kallas review UAE-EU ties
UAE and Italy leaders discuss security and cooperation
UAE and Italy leaders discuss security and cooperation
Pakistan rocked by 6.2 quake from Afghanistan's Hindu Kush
Pakistan rocked by 6.2 quake from Afghanistan’s Hindu Kush
© 2026 Morocco Report | All Rights Reserved
  • Home
  • Contact Us
Welcome Back!

Sign in to your account